Sliding doors are to be built in with window door beading on the outside of the building i e.
Aluminium sliding door frame installation instructions.
Fixed panel installation oox.
Then have a friend help you lift the first section of the sliding door.
Set the bottom in place on the track in the door frame and then press the top portion of the door in place too.
1213 series clearview package doors 720 723 and 725 series half round ticket windows 9dsa 9dbl 9b1dsa 9b1dbl 9b3dsa 9b3dbl communicators cvm convex mirrors for 26 660 mm diameter and larger dd1616 deal drawer fl4146 sliding deal tray narrow inset frame windows s s.
Step 6 inserting sliding panel 1.
Set the fixed panel into position from the outside of the frame by inserting the top and swinging the bottom in setting it into the groves in the sill and push it tight against the jamb.
Top membrane of sliding door must be secured to lintel.
Place shims around the edges and top of your door frame every 12 inches.
Install the sliding glass panels and handle.
Sliders on the inside.
Shelves s11w s1ew standard inset frame windows.
Our high quality leed compatible interior aluminum frame systems make wilson partitions a leader in design and fabrication.
Repeat with the second section of the sliding door.
Install the dust plugs top and bottom in the interlock of the fixed panel.
Place your door hinges and secure them in place with screws.
Tilt the door into the opening with the bottom side going in first using shims as necessary to create a secure fit.
Use shims under screw holes to help keep your threshold in good shape.
Sliding doors are sunk into the floor.
Ground level must be 100 level as illustrated in fig a a stone can cause a problem as illustrated in fig c.
Sustainable our leed compliant interior doors frames sliders and glazing systems are expertly crafted using high quality prime aluminum blended with recycled material.
All wooden products.
First carefully clean all debris from the rails to get a good fit.
Lift the door into position top rst and then pivot the bottom into place making sure that the wheels are on the track.
Adjust the wheels at both the top and bottom in order.